MONITORING ACTIVITIES – AUGUST 2012
Woodard & Curran performed the following monitoring activities between August 2 and 20, 2012:
- Tobin Hall Deck – A visual inspection of the encapsulated concrete wall surface was performed and one verification wipe sample collected;
- Webster House – A visual inspection of the encapsulated interior elevator lobby walls and the metal cladding/window frames on the northwest building elevation was performed and three verification wipe samples collected from the interior lobby walls;
- Southwest Concourse – A visual inspection of encapsulated concrete building walls, retaining walls, and concrete within the pedestrian tunnel was conducted and 19 verification wipe samples collected from representative locations throughout the project area; and
- Field and Grayson Houses – A visual inspection of encapsulated concrete parapet wall materials at the roofline of the buildings was performed.