Reports

File Title
download 2014 EH&S Annual Report
download 2015 Annual Report for Environmental Health and Safety
download 2016 EH&S Annual Report
download Campus Fire Safety Right To Know Report 2010
download Campus Fire Safety Right To Know Report 2011
download Campus Fire Safety Right To Know Report 2012
download Campus Fire Safety Right To Know Report 2013
download Campus Fire Safety Right To Know Report 2014
download Campus Fire Safety Right To Know Report 2015
download Chenoweth 219 Window Glazing Compound Completion Report 2/1/11
download Chenoweth 219 Window Glazing Compound Remediation Plan 5/25/10
download Du Bois Elevator Completion Report 2013 03 29
download Du Bois Elevator Maintenance and Monitoring Plan 2013 03 29
download Du Bois Elevator PCB Communication 5/19/10
download Du Bois Elevator PCB Communication 6/4/10
download Du Bois Elevator Project Status Update 10/15/10
download Du Bois Initial Post Abatement Monitoring Results 2012.09.13
Hills Building Remediation
download LGRC Air Monitoring Results, 5-26-09
download LGRC Consent Agreement and Final Order, 2012-06-20
download LGRC DEC Interim Measures Plan - 2011.02.11
download LGRC EH&E Additional Indoor Sample Results, 2-21-07
download LGRC EH&E Immediate Response Action Status Report, 11-15-06
download LGRC EH&E Preliminary Report of Building-Related PCB Assessment, 10/12/06
download LGRC EH&E Project Synopsis of PCB issue at LGRC, 5-15-07
download LGRC EH&E Proposed Abatement Plan 2-21-07
download LGRC Glazing Material Observations and Sampling Data, 5/14/09
download LGRC Interior Window Glazing Report to EPA, 7/10/09
download LGRC NIH Remediation Completion Report, 1/8/13
download LGRC PCB Interim Measures Completion Report - June 2014
download LGRC PCB Interim Measures Plan 2012 05 07
download LGRC PCB Long Term Maintenance and Monitoring Report 2015 09 29
download LGRC PCB Long Term Maintenance and Monitoring Report 2016
download LGRC PCB Monitoring and Maintenance Implementation Plan - June 2014
download LGRC PCB Remediation Completion Report 2014.12.29
download LGRC Revised MMIP
download LGRC Soils Self-Implementing On-Site Cleanup and Disposal Plan (SIP) March 2009
download LGRC Summary Data Report – Window Glazing and Existing Indoor Sample, 5/15/09
download Long-Term Maintenance and Monitoring Report 2012
download Long-term Maintenance and Monitoring Report 2013
download Long-term Maintenance and Monitoring Report 2015
download Long-term Maintenance and Monitoring Report 2016
download Long-Term Monitoring and Maintenance Implementation - 2014 Monitoring Results
download OH Field and Grayson Roof Completion Report 2012 04 24
download OH Field and Grayson Window Replacement - EPA Approval 2012 04 30
download OH Field and Grayson Window Replacement - Remediation Plan 2012 01 06
download OH Webster Windows PCB Remediation Plan March 2011
PCB Remediation
download Physical Plant Window Caulk Remediation Plan March 2012
Residential Fire Log
download SW Concourse PCB Completion Report 02.2011
download SW Concourse Release Abatement Measure (RAM) Completion Report and Class A-2 Response Actions Outcome 06.2011
download SW Crampton Amendment to Remediation Plan 5/9/12
download SW Crampton and MacKimmie PCB Completion Report 2012-04-27
download SW Residential Area MMIP, 12-21-10
download SW Residential Concourse 120 Day Release Abatement Measure Status Report 10/14/10
download Sylvan Complex - Soil Characterization Report
download Sylvan PCB Remediation Completion Report 2014.02.20
download Sylvan Remediation Plan Addendum 6/19/13
download Sylvan Residential Complex - PCB Remediation 2013 03 15
download Tobin Hall Deck PCB Completion Report and Addendum 2013 05 10