Physical Plant Window Caulk Remediation Plan March 2012

On behalf of the University of Massachusetts (UMASS), ATC Associates, Inc. (ATC) is requesting review and approval of the PCB Cleanup and Disposal Plan for PCB bulk product waste (original caulking) and PCB remediation waste (impacted building materials) at the Physical Plant Building located on the UMASS campus in Amherst, Massachusetts.

Specifically, this plan would address removal of PCB caulking, window assemblies and impacted building materials within Room 230A, which is part of an overall renovation project of the second floor area of the building.