LGRC PCB Long Term Maintenance and Monitoring Report 2019

This monitoring report has been prepared by Woodard & Curran on behalf of the University of Massachusetts (UMass)
in accordance with the requirements of the Consent Agreement and Final Order (CAFO) dated June 20, 2012 between
UMass and the U.S. Environmental Protection Agency (EPA) for the Lederle Graduate Research Center (LGRC) Tower
A and Low-Rise buildings located at 701 – 740 North Pleasant Street on the UMass campus in Amherst, Massachusetts
(see Figure 1-1).

This monitoring report provides the results of the monitoring activities conducted in accordance with the December
2014 Revised Monitoring and Maintenance Implementation Plan (MMIP) developed in accordance with the
requirements of the CAFO for the encapsulated polychlorinated biphenyl (PCB) containing window glazing sealants at
the Tower A and Low-Rise buildings and the encapsulated residual PCBs in certain exterior masonry materials at the
Low-Rise building.